TrackTreads Knowledge Base
  • System Administration
  • Undercarriage
  • Digital Inspections
  • GET, Buckets & Trays
  1. Home
  2. Old Menu Structure
  3. Undercarriage OLD
  4. Undercarriage Inspection Guides
  5. Rope Shovel Measurements
Searching...
Rope Shovel Measurements

Rope Shovel Measurements

  • First 100Hrs. Service

    Components of the Undercarriage Check crawler shoe adjustment. With the shovel on a level surface propel the machine so that...
  • Daily Checks Operator & Runing Checks

    Operator Checks Visual inspection (Check retainer pins, broken lubrication hoses, broken track pads, and component damage). Running Checks Visual inspection...
  • 750Hrs. Service (PM)

    Cycle lube system check for leaks and Injector functionality. Visually check for the lube on load rollers, Idlers and final...
  • 1,500Hrs. Service

    1,500Hrs Undercarriage Inspections Track Pad Wear New 1.76″ Using a straight edge measure roller path wear on the crawler shoes....
  • Level 1, Midlife 6,000Hrs

    Replace Sliders • Remove tracks from top of crawler frame.• Clean top of crawler frame and replace front and rear...
  • Level 2 Midlife 12,500Hrs

    In addition to the 1500Hrs. Inspection complete the following. Replace all sliders • Remove tracks from top of crawler frame.•...
  • Level 3 Midlife 18-19,000Hrs.

    Replace sliders Remove tracks from top of crawler frame. Clean top of crawler frame and replace front and rear sliders....
Need Support?
Can't find the answer you're looking for? Don't worry we're here to help!
CONTACT SUPPORT

Need Support?

Can't find the answer you're looking for? Don't worry we're here to help!
CONTACT SUPPORT

Knowledge Base Categories

  • WSRE
  • Web Portal
  • Using the Mobile Application
  • Users, Customers, Jobsites, Dealers, Access
  • Undercarriage OLD
  • Undercarriage Inspection Guides
  • Undercarriage Best Practices
  • Undercarriage Administration Tasks
  • Undercarriage Admin
  • Undercarriage
  • Tray
  • System Administration – OLD
  • Supervisory Tasks
  • Setup Undercarriage
  • Setup Digital Inspections
  • Setup Buckets & Trays
  • Rope Shovel Measurements
  • Review and Reporting
  • Reporting
  • Repairs & Rebuilds
  • Reliability & Interpretation Tasks
  • Release Notes
  • Planning
  • Performing Inspections
  • Other Observations
  • Old Menu Structure
  • Mobile Inspections
  • Measuring With Cygnus Ultrasonic Tool
  • Makes, Models & Equipment
  • Liebherr – R996/R996B
  • Liebherr – R994/R994B
  • Liebherr – R9800
  • Liebherr – R9600
  • Liebherr – R9400
  • Liebherr
  • Liebherr
  • Komatsu
  • Job Site Conditions
  • Inventory
  • Interpretation
  • Inspection Review & Reporting
  • Inspection Kits
  • Hydraulic Shovel Component Measurements
  • Hydraulic Shovel
  • How to Measure Undercarriage Components
  • How Do I Use the System?
  • Hitachi
  • GET, Buckets, Trays Administration
  • GET, Buckets, Trays & Chassis
  • Frame Rebuilds
  • Field Inspections
  • Field Inspection Tasks
  • FAQ
  • Excavator Measurements
  • Excavator
  • EX8000
  • EX2500/2600/3500/3600/5500/5600
  • EX1200/EX1900/EX2000
  • Dozers
  • Dozer Measurements & Observations
  • Digital Inspections
  • Digital Field Inspections Admin
  • Caterpillar
  • Buckets
  • Bucket, Tray and Chassis Crack management
  • Actions

Need Support?

Can't find the answer you're looking for?
Contact Support

Categories

  • No categories
© Copyright TrackTreads Knowledge Base.